Hi:
Patient in hospital for pancreatic neck resection. Post operatively the surgeon initiates order for TPN. Would the TPN management by the surgeon be considered unrelated to the condition for which the surgery was performed and therefore qualify to append modifier 24 to the subsequent visit code? Thanks

